We preformed the framing on this project. Located in Sunriver this project provided an extra challenge being built in the winter months. The site access was limited and material staging areas were minimal. Using one of our RT Forklifts we were able keep things moving smoothly. To get the crane set in place on truss day we assisted by towing the truss trailer up the sloped driveway to get the job done. The exposed beam work that carries through the center of the home and above the garage was both challenging and fun.